This week we started organising filming and editing schedules and organising with actors and camera men when we will be filming and what time and what location. We have also finished the storyboard and have looked at it and made changes to it where necessary. One way we did this was through the animatic in which we had our storyboard set in time with the music which helped us see what changes we needed to make so that it fit as much as possible with the music. We have also looked at issues that could arise during filming such as technical difficulties and health and safety so that we can prepare for these in advance and hopefully avoid them as we film and edit.